top of page

SALT PILL

  • Used in over 10,000 wells in both oil & gas in Egypt alone.

  • Return permeability of minimum 95% of the original K. 

  • The pill seals at the formation face and can be produced with a 20 psi negative pressure. 

  • The pill is 100% water soluble from produced water from the formation or induced water.

  • The pill usages are - mainly but not limited to - Completion , Re-completion & Workover:

    • Before or after perforations, prior to P.O.O.H.

    • When a change of Pump is needed.

    • When a change of String is needed.

    • After a Frac job &/or an Acid job prior to P.O.O.H.

    • To locate and test holes in the casing or a leak in a liner. 

    • Rigless in high pressure gas wells to shut off upper producing zones and be able to open the lower one.

    • Sealing inside a Gravel Pack Screen prior to P.O.O.H.

​

Energy Inc has Engineers that are highly trained in all the above listed applications, to design, mix and displace downhole the pill to effectively seal at the formation face. 

 

Please contact us to be provided with the needed information in order to design a suitable pill for your well.

bottom of page